Knowledge

ASTM A252 GR3 steel pipes and plate for Piling Construction

Dec 02, 2025 Leave a message

This order is for ASTM A252 GR3 LSAW steel pipes supplied to our regular customers in the Middle East. The client has been cooperating with Gnee since 2020, and the partnership has now lasted for four years.

 

After years of successful cooperation, the customer has developed a high level of trust and recognition for the steel products manufactured by Gnee.

info-442-442

The continuous orders over these years are not only a result of their confidence in Gnee's brand and product quality, but also due to their appreciation of Gnee's reliable and efficient service.

 

The order includes more than 400 tons of LSAW pipes and steel plate products, and the transaction process remained as simple and efficient as always. From the customer's initial inquiry to final order placement and payment, the entire process took only one week.

 

Chemical Composition (Typical Values)

 

Element Content (%)
Carbon (C) ≤ 0.26
Manganese (Mn) ≤ 1.20
Phosphorus (P) ≤ 0.05
Sulfur (S) ≤ 0.05
Silicon (Si) 0.15 – 0.40 (typical, not always specified)

 

Mechanical Properties

 

Property Requirement
Tensile Strength ≥ 66,000 psi (455 MPa)
Yield Strength ≥ 45,000 psi (310 MPa)
Elongation ≥ 20% (in 2 in / 50 mm)
Hardness (Brinell)** 150–180 HB (typical range)**

 

Permissible Pipe Dimensions

 

Parameter Range
Outside Diameter (OD) φ 8" – 120" (219 mm – 3,048 mm)
Wall Thickness 6.35 mm – 25.4 mm (or customized)
Length 6 m, 12 m, or customized up to 24 m

 

Tolerances (ASTM A252 Standard)

 

Item Tolerance
Outside Diameter ±1%
Wall Thickness –12.5% (no upper limit unless specified)
Straightness ≤ 1/8 in × length
Length Tolerance +50 mm / 0 mm or as required

 

Standard End Types

 

End Type Description
Plain End Standard delivery
Beveled End 30° bevel for welding
Threaded & Coupled Upon request
Welded Rings / Flanges For piling applications

 

Gnee maintained its usual fast response-quickly arranging production, inspection, and shipment within one month. To ensure the smooth progress of the client's project, we also pre-booked a direct bulk vessel, which will arrive at the destination port in 20 days. In total, the entire order took just 60 days from placement to customer receipt.

 

During every shipment, we stay in close communication with our clients and provide timely updates, including finished product photos and shipping documentation.

 

The customer has always been very satisfied with our products and services, and they continue to be pleasantly surprised by Gnee's rapid delivery schedule. They have expressed their ongoing support for Gnee and confirmed that they will maintain long-term cooperation with us.

 

Contact now

 

 

info-536-393

 

Send Inquiry