S275JR C channel steel
Channel steel is a long strip of steel with a groove-shaped cross-section. It belongs to carbon structural steel for construction and machinery. It is a section steel with a complex cross-section.Channel steel is mainly used in building structure, curtain wall engineering, mechanical equipment and vehicle manufacturing.

|
Product Name |
S275JR C channel steel |
|
|
1. Web Width (H): 37mm-88mm |
|
Length |
6000mm,12000mm or customized |
|
Technique |
Hot rolled |
|
Grade |
Q235B Q345B Q420C Q460C SS400 SS540 S235 S275 S355 A36 A572 G50 G60 etc. |
|
Inspection |
SGS BV INTERTEK |
|
Standard |
ASTM,GB,JIS,EN,etc. |
|
Product Keywords |
C/U channel for construction, building |
|
Delivery Time |
Within 7 working days after receiving deposit, up to order quantity |
|
Shipping |
1) Shipping by containers |

The dimensions and properties of S275JR channel steel can vary based on the specific standards and requirements. These channels typically have a standard length and are produced in various sizes, such as:
1、Depth (height of the channel): It can range from a few centimeters to over 30 centimeters, depending on the intended application and load-bearing requirements.
2、Flange Width: The width of the top and bottom "flanges" (parallel legs) can also vary significantly, and different sizes are available to suit different structural needs.
3、Flange Thickness: The thickness of the flanges may vary and is essential for determining the overall strength and load-bearing capacity of the channel.
4、Web Thickness: The thickness of the vertical "web" between the flanges is also a critical factor affecting the strength and rigidity of the channel.

FAQ:
Q1: What is your MOQ?
A: Usually our MOQ is one container, but it is different for some items, please contact us for details.
Q2:What is your terms of payment?
A:We usually accept T/T in advance, L/C for large sum.If you prefer other payments terms, please discuss.
Q3:What is your delivery time?
A:For products in stock, we can ship it within 7 days after receiving the deposit. For custom order, production time is 15-30 workdays after received the deposit.
Q4:How could you guarantee your products?
A:Mill Test Certification is supplied with shipment, We also accept and support the third-party inspection.We also could issue the warranty to customer to guarantee the quality.
Q5: Will all costs be clear?
A:Our quotation is easy to understand and will not incur any additional costs.
Hot Tags: s275jr c channel steel, China s275jr c channel steel manufacturers, suppliers, factory, metal l channel, EN Channel Steel, S275JR Channel Steel, S235JR Channel Steel, steel furring channel


